Hainan Haizhou Fluid Technology Co., Ltd.

Coal Chemical / Metallurgical Industry | Xinjiang East Hope Nonferrous Metals Co., Ltd.

202007070956186163967
 
 
 

Project Conditions

52°C → 32°C | Wet-bulb: 23.4°C | Flow: 2,400 m³/h | Cooling medium: Water

Application Equipment

Industrial circulating water system for the aluminum production area, including the power station and desalination water station.

Solution

GFNGP-1000 concrete-structure dry-wet combined closed cooling tower, designed for stable cooling with reduced water consumption and winter fogging.

Operating Principle

Dry and wet cooling sections operate in series. Fans and spray pumps are automatically adjusted according to outlet water temperature to maintain stable cooling performance.

Project Results

 

 

  • Outlet water temperature: 32°C
  • Water saving: up to 65%
  • Reduced winter fogging
  • Stable and energy-efficient continuous operation
goTop